York College Framework

York College is a highly regarded education institution that ranks among the top three colleges in the UK. As the sole supplier of a multidisciplinary consultancy team, we support the College’s investment in its campus and ensure the best possible learning environments.

We have been a trusted partner of York College since 2018, when appointed to the college’s first framework. Reappointed to the College’s framework in 2024 for a second term, we offer an integrated solution combining architecture, building surveying, project management, interior design, and principal designer services. We also work with trusted partners, including quantity surveyors Summers Inman and Adept civil and structural engineers, to cover all necessary disciplines.

Our partnership is underpinned by consistently excellent KPI results, demonstrating our commitment to the College’s long-term success. With a real understanding of the campus, we have forged strong working relationships with key College staff and continuously support their objectives.

Key Projects
Atrium Repair: Our first project involved overseeing the £100k repair of the central glazed atrium within a six-week summer break. Despite challenging weather, we completed the work on time with a 20-year guarantee.

Institute of Technology Refurbishments: Our relationship with York College grew stronger when we assisted the college in securing central government funding to create an Institute of Technology. York College was selected as one of only 12 Institutes of Technology in England, leading to several refurbishment projects, including remodelling the library, teaching spaces, and media areas.

Motor Vehicle Workshop: The £600,000 project created additional space for training mechanics, engineers, and technicians. Delivered during the 2020 lockdown, it provided teaching space and supported social distancing. The handover to the client was planned to coincide with Reading Week at the College, which allowed the tutors time and space to set up before the students returned for the next term.

Construction Centre: Supporting the introduction of T-Level qualifications, we oversaw a two-storey extension to the construction centre, which included joinery and brickwork workshops, classrooms, and IT suites. The 44-week programme was strategically phased outside of term time. The construction centre extension addressed immediate space requirements, demonstrating innovative problem-solving and a commitment to sustainability. The project was completed on time and within budget, earning a Very Good BREEAM rating.
Student Hub: We designed the refurbishment of the student hub, creating a welcoming, efficient space that integrates reception, student services, and learning resources for students to work and collaborate.

See our other education projects.